Fairmount Road Pump Station Expansion
| |||
| |||
Project Description
This project will evaluate the existing Fairmount Road Pump Station and expand the pump station to handle all potential sanitary sewer flows within its existing service area. The initial design of the PS required two 88 HP pumps. This expansion will replace these two pumps at 120 HP each using the existing wet well and force main. | |||
Need
The existing pump station is near capacity due to development and inflow and infiltration issues. This project will be initiated as needed. | |||
Other Information None. |