Floyds Fork Hydraulic
| |||
| |||
Project Description
The area served by the new Floyds Fork Co WTP has a history of significant wet-weather inflow and infiltration (I&I) into the sanitary sewers. This has resulted in excessive sanitary sewer overflows, and the treatment plant being overloaded during periods of wet weather.The Consultant will develop a computer model of the sewer system outside of J-Town. This model will track dry weather flow, wet weather inflow, and evaluate proposed remediation. | |||
Need
To build a working hydraulic sanitary sewer system model of the collection system in order to better analyze extensive rehabilitation recommendations before beginning construction. | |||
Other Information None. |